What is the proportion of material cost to total production cost for concrete pumper?
2020-11-15
The total production cost equal the sum of direct materials costs, direct labor costs, and manufacturing overhead costs. In the production process of concrete pumper, the direct materials cost is one of the few variable parts. For some mature and well-developed producers, they focus on developing or importing high-end technology to reduce the materials waste as much as possible, therefore enhancing the utilization ratio of raw materials. This, in turn, can reduce the investment in the raw materials while ensuring the quality.
Bangbo Array image5
Bambo Machinery Co.,Ltd. takes pride in itself with its excellent track record of manufacturing a range of used concrete machine. According to the material, Bangbo Concrete Machine's products are divided into several categories, and concrete batching plant is one of them. The production of Bangbo concrete pump truck for sale is strictly controlled with necessary electrostatic protection, from the production environment and equipment to operation staff. The product is built to last. Its strong and tough structure enables it to work normally under high temperature and high pressure.
Bangbo Array image5
Bangbo Concrete Machine has always been committed to ensuring the quality of service. Please contact.

Custom message
Chat Online
Chat Online
Chat Online inputting...